|

Download Snap Installation
1. Place ESD matting on workstation. Locate the safest grounding point (outlet).
2. Choose which side of the mat has the closest or most convenient access to the grounding point.
3. Locate an area 1 –2 inches in from each corner of the mat on the side that was determined in step 2.
4. Press snap downward until prongs puncture matting and are fully visible on the underside of the mat.
5. Bend the prongs of the snaps until flush against the underside of the mat.
6. Add additional snaps -for a total of at least two- every 10 feet or the length the mat allows.

Contact Transforming Technology today for your grounding snap needs.
Transforming Technologies, LLC
3407 Silica Rd.
Sylvania, OH 43560
(419)841-9552
(419)841-3241 fax
|